PARIS–(BUSINESS WIRE)–TotalEnergies (Paris:TTE) (LSE:TTE) (NYSE:TTE) has shipped to Asia the very first cargo from ECA LNG Phase 1, a liquefied natural gas (LNG) export terminal currently under commissioning on Mexico’s Pacific Coast, in Baja California. TotalEnergies, which holds a 16.6% stake in the project alongside operator Sempra Infrastructure, will offtake 1.7 million tonnes per year (Mtpa) of LNG for 20 years from the start of commercial operations. TotalEnergies will be the sole offt
Leave A Comment
You must be logged in to post a comment.