MIAMI–(BUSINESS WIRE)–Following ON.energy’s January 2026 deployment of AI UPS™ at the U.S. Department of Energy’s National Laboratory of the Rockies (NLR), the company today released independent validation results demonstrating the medium-voltage system’s performance under real-world conditions, with results benchmarked against ERCOT’s proposed large electronic load (LEL) ride-through requirements. The testing, conducted at 13.2 kV using NLR’s distinct 7 MW and 20 MW controllable grid interfa