JENBACH, Austria–(BUSINESS WIRE)– #CriticalInfrastructure–INNIO Group has signed a contract with KMW (Kraftwerke Mainz-Wiesbaden AG) for a new 54-MW peaking power plant. A total of twelve modular energy systems from INNIO are intended to be operated at the site. Part of the plant’s capacity is expected to be available for the “Green Rocks” data center, which is being built by KMW and Norwegian data center operator Green Mountain. INNIO’s decentralized energy solutions serve as backup in case of a blackout due to grid
Leave A Comment
You must be logged in to post a comment.