MONTRÉAL–(BUSINESS WIRE)—- $NMG #ESG–Nouveau Monde Graphite Inc. (“NMG” or the “Company”) (NYSE: NMG, TSX: NOU) issues the results of the Updated Technical Feasibility Study Report for the Matawinie Mine and Bécancour Battery Material Plant Integrated Graphite Projects (the “Updated Feasibility Study”) carried out in accordance with the National Instrument 43-101 (“NI 43-101”). Conducted by BBA Inc. and various specialized consultants, the Updated Feasibility Study pulled from NMG’s 2022 Feasibility Stud
NMG Issues Updated Feasibility Study for its Integrated Phase-2 Ore-to-Active-Anode-Material Operations: the Matawinie Mine and the Bécancour Battery Material Plant
About the Author:
Related Posts
-
Kuwait Oil Company Signs US$ 16.0 Billion Infrastructure Partnership Involving Its Crude Oil Pipeline Network With a Consortium Comprising Blackstone, Brookfield and KKR
Kuwait Oil Company Signs US$ 16.0 Billion Infrastructure Partnership Involving Its Crude Oil Pipeline Network With a Consortium Comprising Blackstone, Brookfield and KKR
Leave A Comment
You must be logged in to post a comment.